the story of spaceflight told through missions & programs that didn't happen - that is, the great majority of them
Chronology: Venus 1.0
This time around, the subject area is Venus. Until the early 1960s, many scientists held out hope that Venus might support life. Even before Mariner II flew past it (14 December 1962), however, scientists had begun to suspect that close examination would undermine their visions of a clement Venus. The cloudy planet soon became an object lesson in the importance of greenhouse gases in planetary atmospheres.
Among the planets, no world has received more visitors than Venus. From the 1960s until the 1980s, Venus was the main planetary exploration target of the Soviet Union; no country placed more spacecraft on the Venusian surface.
Mariner 10 was the first spacecraft to fly by Venus and use it as a gravity-assist way station (5 February 1974); that is, it used the planet's gravity and orbital momentum to change its course and speed, enabling it to conduct three Mercury flybys in 1974-1975. The twin Soviet Vega spacecraft each used a Venus gravity-assist in 1985 to gain enough energy to reach Comet Halley in 1986; during their Venus flybys, they released combination lander/balloon payloads.
Venus helped to rescue the NASA robotic exploration program in the late 1980s. The U.S. space agency had intended to launch the Galileo Jupiter orbiter and probe into low-Earth orbit in May 1986 attached to a powerful Centaur G-prime upper stage in the payload pay of a Space Shuttle Orbiter. Astronauts would have released the stage and spacecraft, then the former would have ignited to boost the latter directly to Jupiter, with arrival in December 1988.
After the Challenger Space Shuttle failure (28 January 1986), however, Centaur G-prime, which burned liquid hydrogen fuel with liquid oxygen oxidizer, was judged to be too volatile to carry on board a piloted spacecraft. In its place, NASA opted for a solid-propellant upper stage and a complex Venus-Earth-Earth Gravity Assist (VEEGA) trajectory. Following launch on board the Shuttle Orbiter Atlantis (18 October 1989), a Venus flyby (10 February 1990) put Galileo on course for Earth gravity-assist flybys in December 1990 and December 1992 with arrival at Jupiter in December 1995.
Galileo had been expected to be the first U.S. planetary spacecraft launched since Pioneer Venus Multiprobe (PVM) left Earth in August 1978; its new reliance on the VEEGA trajectory meant, however, that NASA had to shuffle its planetary mission schedule. Because Galileo needed to use the October 1989 launch window for a direct flight to Venus, the Magellan Venus radar mapper lifted off on board Atlantis (4 May 1989), orbited the Sun one-and-a-half times, and entered Venus polar orbit (10 August 1990). Missions to Venus thus bracketed a nearly 11-year drought in U.S. planetary mission launches.
In recent years, we have seen proposals for piloted Venus orbiter and atmosphere missions. These mark a renewal of interest that began in the 1950s and continued through the 1960s. Had those early plans gone ahead, NASA might have launched astronauts on Venus flyby and orbiter missions in the 1970s and early 1980s. Recent proposals and 1960s proposals have in common reliance on robots to explore the harsh Venusian surface; no humans would land there.
Venus is mentioned with (perhaps surprising) frequency throughout this blog. What follows is a chronological list of links to posts with a significant Venus exploration component.
Centaurs, Soviets, and Seltzer Seas: Mariner 2's Venusian Adventure (1962)
EMPIRE Building: Ford Aeronutronic's 1962 Plan for Piloted Mars/Venus Flybys
After EMPIRE: Using Apollo Technology to Explore Mars and Venus (1965)
Venus as Proving Ground: A 1967 Proposal for a Piloted Venus Orbiter
Triple-Flyby: Venus-Mars-Venus Piloted Missions in the Late 1970s/Early 1980s (1967)
Apollo Ends at Venus: A 1967 Proposal for Single-Launch Piloted Venus Flybys in 1972, 1973, and 1975
Floaters, Armored Landers, Radar Orbiters, and Drop Sondes: Automated Probes for Piloted Venus Flybys (1967-1968)
Things to Do During a Venus-Mars-Venus Piloted Flyby Mission (1968)
Two for the Price of One: 1980s Piloted Missions with Stopovers at Mars and Venus (1969)
After Venus: Pioneer Mars Orbiter with Penetrators (1974)
High Noon on the Moon (1991)
The Moon, like most other Solar System moons, is a synchronous rotator; that is, the period of time it needs to rotate on its axis once is essentially equal to the period of time it needs to orbit its primary once. For the Moon, the time required for both one rotation about its axis and one revolution about the Earth is about 28 days.
That is why humans on Earth see only the Moon's Nearside hemisphere. The Farside hemisphere, always turned away from Earth, remained mysterious until 1959, when humans glimpsed it for the first time courtesy of the Soviet Union's Luna III spacecraft.
Occasionally the Moon crosses over the Sun; new Moon is the time of partial, annular, and total solar eclipses. An eclipse does not occur every time the Moon is new because the Moon's orbit about the Earth is inclined slightly (about 5.1°) relative to Earth's orbit about the Sun.
The disc of the Moon is about 0.5° wide as viewed from Earth. The Sun, though 400 times farther away than the Moon (about 149,600,000 kilometers versus 363,100 kilometers) is also 400 times bigger than the Moon (about 1,392,000 kilometers versus 3475 kilometers), so it appears to be the same size as the Moon (0.5° wide) in Earth's sky. This means that, during total eclipses, the Sun's ghostly corona becomes visible as the Moon blocks the bright disk of the Sun.
The Moon is, however, moving away from Earth at a rate of about four meters per century. In just a few million years, it will no longer be wide enough in Earth's sky to cause total solar eclipses. All eclipses after that will be either partial or annular.
About two days past new Moon, people on Earth can look west in evening twilight and glimpse a slender crescent Moon (2 on the lunar phase diagram). It is called a waxing ("growing") crescent. The horns of the waxing crescent point toward the east, away from the setting Sun. If one looks carefully, one might observe that the part of the Nearside that is not yet lit by the Sun is visible.
This is probably a good place to mention that the Earth seems to change shape as viewed from the Nearside hemisphere. When the Moon is new, the Earth is full. In fact, Earth phases are always the opposite of Nearside phases.
As seen from the Nearside, the full Earth is about four times larger than the full Moon (2° wide in the black lunar sky) and reflects about 75 times as much light. When the Moon is a waxing crescent, Earth is mostly full. This means that sunlight reflected off Earth can light the part of the Nearside that direct sunlight does not yet reach.
As on Earth, the Sun rises in the east on the Moon. The line between light and darkness — the terminator — advances westward a little faster than a typical human can comfortably jog. High mountains and crater rims catch the morning Sun's bright rays first. Viewed through even a modest-size telescope, they appear as isolated islands of light. As the Sun climbs higher, light fills in the plains, lowlands, and crater floors.
Seven days past new, the Nearside is half lit for observers on Earth (3 on the lunar phase diagram). This phase is called first quarter. The first-quarter Moon rises in the east as the Sun stands at noon, reaches its highest point at sunset, and sets in the west at midnight.
About 10 days past new, the Nearside is halfway between first quarter and full (4 on the lunar phase diagram). We call this phase waxing gibbous ("gibbous" means convex — the term refers to the shape of the advancing dawn terminator).
Fourteen days past new, the Nearside is fully lit by the Sun as viewed from Earth (5 on the lunar phase diagram). The full Moon is visible all night; it rises in the east as the Sun sets in the west, stands highest at midnight, and sets in the west as the Sun rises in the east. When the nearside is full, the Earth is new as viewed from the Moon.
When the Moon is full, the Earth stands between it and the Sun. For this reason, full Moon is when partial and total lunar eclipses — during which the shadow of the Earth falls on the Moon — can occur. As with solar eclipses, lunar eclipses do not occur at every full Moon because the Moon's orbit is tilted relative to Earth's orbit about the Sun.
Newcomers to the pleasures of amateur astronomy often turn their first telescope toward the Moon for the first time at full Moon. If one can stand the bright glare from the fully lit Nearside, one can examine many contrasting light and dark areas through a small telescope; many such albedo features (as they are known) are, in fact, best seen when the Nearside is fully lit. Of particular interest are the Nearside-spanning whitish-gray rays of the large impact crater Tycho.
All things considered, however, the fully lit Nearside appears bland; crater rims and mountains cast no shadows, so all sense of surface relief is absent. The Moon might as well be a painted billiard ball. Viewing the Moon when it is less than full — and focusing on the terminator — is, in my opinion, much more rewarding.
About 18 days past new, the Moon has reached waning (shrinking) gibbous phase (6 on the lunar phase diagram). It rises between dusk and midnight and is visible in clear skies in the west until mid-morning the next day. The terminator line, formerly the line of lunar dawn, becomes the line of lunar dusk. Darkness advances from east to west as light advanced two weeks before.
Twenty-one days past new, night reclaims the Nearside's eastern half. This phase is called last quarter (7 on the lunar phase diagram). For people on Earth, the Moon rises at midnight, stands highest at dawn, and sets at noon.
About 25 days past new, the crescent Moon — called the waning ("shrinking") crescent — rises in the east just before the Sun (8 on the lunar phase diagram). Its horns point westward, away from the Sun. The dark part of the Nearside is again lit by sunlight reflected off a nearly full Earth. A relatively small telescope reveals the advance of the sunset terminator; crater bottoms, lowlands, and plains grow dark, then mountains and crater rims slowly shrink and finally vanish in darkness.
If you look through a telescope at the crescent Moon before dawn, take care not to look at the Sun when it peeks above the horizon; eye damage will result. Instead, attempt to keep sight of the crescent Moon as fades into the blue sky of earthly day.
The end of Day 28 sees a new lunar day-night cycle begin (1 on the lunar phase diagram). The Moon stands between the Sun and Earth, lost in the Sun's glare, and it is again midnight at the center of the Nearside hemisphere.
Changes in orbital geometry and lighting angles in the Earth-Moon system are today mainly of interest to stargazers amateur and professional, but a half-century ago it was different. Apollo missions were leaving Cape Kennedy, Florida, every few months bound for the Moon, and lighting conditions were a critical part of landing site selection and mission timing.
Conservative Apollo mission rules dictated that the LM should land only between 12 and 48 hours after sunrise at its target landing site, when the Sun would stand between 5° and 20° above the eastern horizon. At the appointed time, the Apollo mission Commander (CDR) and Lunar Module Pilot (LMP) would ignite the descent engine of their spindly-legged spacecraft over the Farside to slow it so that its orbit would intersect the lunar surface at its Nearside landing site.
As it approached its pre-planned landing site from the east, the LM would pitch up to point its descent engine and four round foot pads at the lunar surface. As the landing site became visible outside the twin triangular LM windows, the Sun would shine from behind the spacecraft. This would prevent it from shining into the astronauts' eyes. The shadow of the LM would then become visible on the surface, enabling the astronauts to gauge the size of lunar surface features to help them pick out a spot for a safe landing.
Because of limited supplies of avionics cooling water, battery power, and breathing oxygen, the longest an Apollo lunar surface mission could last was about 72 hours. The period during which Apollo explorers could gain experience working in lunar lighting conditions thus only spanned from 12 hours (the earliest permitted landing time) to five days (the latest permitted landing time of two days plus the maximum stay-time of three days) after dawn at the landing site.
In 1991, Dean Eppler, a geologist in the NASA Johnson Space Center (JSC) Lunar & Mars Exploration Program Office (LMEPO) with an interest in lunar geologic fieldwork, conducted a study of the effects on lunar surface operations of the whole range of lunar lighting conditions in support of Space Exploration Initiative (SEI) planning. SEI, launched amid great fanfare by President George H. W. Bush on 20 July 1989, aimed to complete Space Station Freedom, return American astronauts to the Moon to stay, and then launch humans to Mars. "To stay" implied that astronauts would need to land, drive, walk, and work on the Moon throughout its day-night cycle at multiple locations all over the Moon.
Eppler had help from a spaceflight legend. John Young (1930-2018) joined NASA in 1962 as a member of the second Astronaut Class ("the New Nine") and was a veteran of six space missions (Gemini III, Gemini X, Apollo 10, Apollo 16, STS-1, and STS-9), four of which he commanded. He was Chief of the Astronaut Office at JSC from 1974 until 5 May 1987, when he was made JSC Director Aaron Cohen's Special Assistant for Engineering, Operations, and Safety.
![]() |
| Apollo 16 Commander John Young (left) with Command Module Pilot Kenneth Mattingly (center) and Lunar Module Pilot Charles Duke (right). Image credit: NASA. |
Young first had an opportunity to observe the Moon's surface from lunar orbit when he served as Apollo 10 Command Module Pilot (CMP) in May 1969. He told Eppler that, viewed from a spacecraft in lunar orbit, the transition from the sunlit part of the Moon to the earth-lit part was sudden and that the eye adjusted almost immediately to the reduced light level. Features on the lunar surface remained almost as visible as they had been under direct sunlight, and it was even possible to pick out features within shadows in earth-lit areas.
Young reported that the change from the earth-lit part of the Moon to unlit portions of the Farside, out of reach of light from both Sun and Earth, was "dramatic." Nothing could be seen of the Moon's surface even at an orbital altitude of only a few tens of kilometers. The horizon was discernible only because stars were visible above it but not below it.
As Apollo 16 CDR in April 1972, Young piloted the LM Orion to a landing at Descartes, the only Apollo site entirely within the lunar highlands. The highlands, which cover about 80% of the Moon's surface, are lighter in hue than basaltic plains like Sinus Medii.
Young told Eppler that, in his opinion, landing a spacecraft equivalent to the Apollo LM would be possible at a site lit only by light reflected off the Earth. Landing in earthlight at a prepared site — that is, one with flashing strobes and electronic landing aids — would be easier than landing a helicopter at night on Earth, he added.
Young experienced the challenges of getting about on the lunar surface under low-angle sunlight soon after climbing down Orion's ladder at Descartes. Moving toward the Sun (eastward) was difficult because of its fierce glare, and moving away from the Sun (westward) was treacherous because shadows disappeared behind the rocks and crater rims that cast them. This created a washed-out landscape where obstacles were hard to see and avoid.
Moving north or south meant reduced glare and visible shadows. This is one reason why the first two Apollo flights that included a Lunar Roving Vehicle (LRV), Apollo 15 and Apollo 16, had pre-planned lunar traverses that were oriented generally toward north and south.
![]() |
| Image credit: NASA. |
![]() |
| Image credit: NASA. |
![]() |
| Image credit: NASA. |
The top image shows the view toward the glaring low-angle Sun. The middle image shows John Young at work near the Apollo 16 LRV. He is facing north. As the orientation of the shadows indicates, the Sun is located to the right of the field of view, so surface feature visibility is near optimum. Rocks, footprints, and LRV tracks are obvious.
The bottom image, taken facing west directly away from the low Sun, looks very different, but in reality displays a rocky landscape similar to that shown in the top and middle images. Apart from rocks close to Duke (and Duke's own helmet), however, surface features obscure their own shadows and thus are almost invisible.
Based on Young's observations and his own calculations, Eppler proposed schedules for operations at various lunar surface locations. He determined that in Sinus Medii the period from local dawn until 5.5 days after local sunrise would be optimal for walking, driving, and landing.
From 5.5 days to nine days after sunrise at Sinus Medii the Sun would hang within 20° of local vertical, with noon taking place on day seven. The near-vertical lighting angle would mean that terrain features would cast no shadows, making walking and driving difficult. A descending lander would cast a shadow, but only directly beneath the lander, where it would most likely not be visible to the pilot. Eppler advised that only "restricted surface operations" should occur during the near-noon period. Landings should take place only at prepared sites.
The period from nine to 28 days after sunrise at Sinus Medii would be optimal for surface activity, Eppler found, though lighting conditions would vary greatly over that span of time. Between nine and 14 days after sunrise, the Sun would lower toward the west and would again cast visible shadows (except toward the east, away from the Sun). A lunar lander approaching an outpost landing field from the east would have to contend with both direct solar glare and absence of a handy lander shadow. Sunset would occur on day 14, with a half-lit Earth shining high in the sky.
On day 21 — midnight at Sinus Medii — full Earth would light the landscape. Seven days later, with a half-Earth high in the sky, the Sun would rise again in the east. Surface activity could thus take place at Sinus Medii without break or restrictions for 24.5 days of the 28-day lunar day/night cycle; that is, from day nine after sunrise to day 5.5 after sunrise.
At the center of the Farside, the lighting situation would be very different. Starting 14 days after local dawn, the Sun would set and — with no Earth in the sky — the landscape would become lost in darkness. Only by using artificial lighting could astronauts find their way. Landings would be prohibited throughout Farside night except at prepared sites.
Eppler also examined lighting on the east and west lunar limbs (that is, on the edges of the Nearside hemisphere near the equator) and at the Moon's poles. The western limb would see the Sun set in the west 14 days after local sunrise with a full Earth on the eastern horizon. The lighted fraction of the Earth would decrease as night progressed.
Between day 23 and day 28 after sunrise at the western limb site, Earth would provide too little light for surface operations without artificial lights. It would become completely invisible at western limb sunrise — which would, of course, occur in the east.
The eastern limb would experience sunset while Earth was new, so would become very dark immediately. Eppler expected that a fat crescent Earth, located just above the western horizon, would provide adequate lighting for surface operations starting on day 19 after local sunrise. On day 21, Earth would be half lit, and it would be full on day 28, when the Sun would once again rise in the east.
The lunar poles would see Earth phases like those at Sinus Medii. Earth would hover, bobbing and tilting slightly, near the Nearside southern horizon for north pole sites and near the Nearside northern horizon for south pole sites.
The Sun would circle the horizon at a polar site, never setting. Astronauts would need to note its position on the horizon and take care not to turn directly toward it without adequate eye protection. In addition, local mountains and crater rims would occasionally block the Sun or Earth and some areas — mainly deep crater bottoms — would forever lie in cold shadow.
Sources
Lighting Constraints on Lunar Surface Operations, NASA Technical Memorandum 4271, Dean B. Eppler, NASA Johnson Space Center, May 1991.
Forever Young: A Life of Adventure in Air and Space, John W. Young with James R. Hansen, University Press of Florida, 2012.
More Information
What If an Apollo Lunar Module Ran Low on Fuel and Aborted its Landing? (1966)
Keep My Memory Green: Skill Retention During Long-Duration Spaceflight (1968)
Log of a Moon Expedition (1969)
Chronology: Apollo-to-Shuttle Transition 2.0
Three years ago I published on this blog the first of my "Chronology" compilations of links to posts with a common theme. That first chronological compilation brought together links to posts on the transition from Apollo to the Space Shuttle. The aim was to impose chronology on posts that do not occur in chronological order in this blog as an aid to reader understanding.
This, my fourth "Chronology" compilation, updates that first compilation. I've added links to three posts dating from 1968, 1970, and 1972; that is, near the start, at the middle, and near the end of the planning phase of the Apollo-Shuttle transition.
"A True Gateway": Robert Gilruth's June 1968 Space Station Presentation
Series Development: A 1969 Plan to Merge Shuttle and Saturn V to Spread Out Space Program Cost (December 1969)
Think Big: A 1970 Flight Schedule for NASA's 1969 Integrated Program Plan (June 1970)
McDonnell Douglas Phase B Space Station (June 1970)
From Monolithic to Modular: NASA Establishes a Baseline Configuration for a Shuttle-Launched Space Station (July 1970)
An Alternate Station/Shuttle Evolution: The Spirit of '76 (August 1970)
Apollo's End: NASA Cancels Apollo 15 & Apollo 19 to Save Station/Shuttle (August-September 1970)
The Last Days of the Nuclear Shuttle (February 1971)
A Bridge From Skylab to Station/Shuttle: Interim Space Station Program (April 1971)
Where to Launch and Land the Space Shuttle? (April 1972)
"Still Under Active Consideration": Five Proposed Earth-Orbital Apollo Missions for the 1970s (August 1972)
The First Voyager (1967)
In January 1967, NASA's Office of Space Science and Applications published a 26-page brochure as part of its efforts to move Voyager from planning to development. The brochure was an introduction (and sales pitch) aimed at members of Congress and other individuals who would need to support Voyager if it was to become part of NASA's approved planetary exploration program for the 1970s.
In the foreword to the brochure, Homer Newell, NASA Associate Administrator for Space Science and Applications, explained that Voyager's chosen launch vehicle was the "awe-inspiring" Saturn V. One three-stage Saturn V rocket would launch two 12-ton Voyager spacecraft to Mars. For comparison, the Mariner IV Mars flyby spacecraft, launched on an Atlas-Agena D rocket in November 1964, had weighed only 260.4 kilograms. Newell wrote that
NASA, the brochure explained, favored Mars over Venus as Voyager's first exploration target because "the high surface temperatures on Venus make the existence of extraterrestrial life less likely than on Mars" and because "the thin, normally transparent Martian atmosphere is conducive to detailed scanning of its surface features from orbit." In addition, "manned landings on Mars will someday be possible. . .[but] they may not be possible on Venus."[s]uccesses already achieved in the 1960s with unmanned spacecraft of limited weight and power. . .foretell the great work of exploration that lies ahead. . .With Voyager, the U.S. capability for planetary exploration will grow by several orders of magnitude. . .Voyager could well be the means by which man first learns of extraterrestrial life.
The brochure placed Voyager within an evolutionary robotic exploration program designed to take advantage of low-energy Earth-Mars transfer opportunities that occur every 26 months. It retroactively made Mariner IV, which had flown by Mars on 14-15 July 1965, the first mission in its program. Inclusion of Mariner IV, the first successful Mars explorer, is somewhat ironic, for its discoveries had helped to undermine support for Voyager.
In addition to recording for slow playback 21 black-and-white images that took in about 1% of the martian surface, Mariner IV had enabled Earth-bound scientists to measure martian atmospheric pressure by transmitting its feeble radio signal through the atmosphere as it passed behind the planet as viewed from Earth. Based on the degree of refraction of the signal, scientists had determined that surface pressure on Mars is not, as expected, about 10% of Earth sea-level pressure; it is, in fact, less than 1% of Earth sea-level pressure.
The first Voyager missions would take place in 1973. A battery-powered Voyager Lander with a mass of up to 390 kilograms would seek life and observe changes at the landing site over several days, and a solar-powered Voyager Orbiter would observe seasonal changes on a planet-wide scale for months.
The Voyager 1975 orbiters and landers would rely on Radioisotope Thermoelectric Generators (RTGs) for electricity. This would allow the landers to survive on Mars for one martian year (about two Earth years); that is, long enough for them to observe seasonal changes at their landing sites. Voyager could land up to 499 kilograms on Mars in the 1975 opportunity. The 1977 and 1979 Voyager missions would see introduction of a lander-deployed Mars surface rover and biological experiments specially designed to study any living things found in 1973 and 1975. A Voyager lander could deliver up to 680.4 kilograms to the surface of Mars in 1977 and 1979.
The brochure then detailed the 1973 Voyager Mars mission, which it described as typical. Voyagers would lift off from the Kennedy Space Center Complex 39 launch pads NASA built for the Apollo Saturn V launches. The 1970s Mars launch windows would last at least 25 days and would include daily one-hour launch opportunities. Voyager Saturn V rockets would be identical to Apollo lunar Saturn Vs; that is, each would comprise an S-IC first stage with five F-1 engines, an S-II second stage with five J-2 engines, and an S-IVB third stage with one J-2.
Voyager's launch shroud would measure 6.7 meters in diameter — the same diameter as the S-IVB stage — and would have a mass of 4.7 tons. Once in Earth orbit, the shroud's conical top section would jettison, exposing the upper Voyager to space. The S-IVB stage would then ignite a second time to push the Voyagers out of Earth orbit toward Mars. After S-IVB shutdown, the upper Voyager would separate. The shroud's cylindrical central portion would then jettison to expose the lower Voyager, which would separate from the S-IVB a short time later. In the 1973 opportunity, each Voyager would have a mass of 10.25 tons after separation.
As each Voyager neared Mars, it would fire its main rocket engine to slow down so that the planet's gravity could capture it into an elliptical orbit. Initial orbit periapsis (low point) would be about 1127 kilometers above the planet, while apoapsis (high point) would occur beyond the orbit of Deimos, the outer martian moon, which orbits at a mean altitude of 22,660 kilometers. The brochure noted that the leading Voyager main engine candidate was a modified Apollo Lunar Module descent engine. The complete Voyager Orbiter propulsion system fully loaded with propellants would weigh 6.5 tons.
After orbit insertion, the Orbiter's instruments would be turned toward Mars to image candidate sites for the first Voyager landing. After scientists and engineers on Earth settled on a site, the 2.5-ton Voyager landing capsule would eject its sterilization canister, separate from the Orbiter beyond Deimos, and fire a 188.2-kilogram solid-propellant deorbit rocket to change its path so that at periapsis it would intersect the martian atmosphere. The deorbit rocket would then detach.
The Voyager landing capsule would enter the martian atmosphere moving at between two and three miles per second. Aerodynamic braking using the 6.1-meter-diameter conical heat shield would cut speed to between 122 and 305 meters per second by the time the capsule fell to within 4570 meters of the surface. The heat shield would eject, then the Lander would fire its descent engines and deploy a supplemental parachute.
![]() |
| Voyager hardware heritage. Note the Voyager capsule and Lander configurations. Image credit: NASA. |
The 1973 Lander would include 136.1 kilograms of science equipment. Over several days, it would search for water and life, measure cosmic and solar radiation, and study the atmosphere — it would, for example, measure the quantity of dust in the martian air.
The 1973 Orbiter, for its part, would include 181.4 kilograms of scientific instrumentation, which it would use to map Mars in detail and search for surface changes over time, determine surface composition, and measure solar and cosmic radiation. The Orbiter would also act as a martian weather satellite. It would, the brochure explained, use its main engine to change the altitude and inclination of its orbit several times during its two-year operational lifetime, allowing detailed study of much of Mars.
Congress refused to fund Voyager in FY 1968, in part because it had come to be seen as a lead-in to a costly post-Apollo piloted Mars/Venus flyby program, and also because the Apollo 1 fire (27 January 1967) undermined confidence in NASA. The U.S. civilian space agency formally abandoned its Voyager plans in September 1967.
In 1968, however, Congress agreed to fund the Viking program in FY 1969. Like Voyager, Viking would emphasize the search for life and would use twin spacecraft, each including a lander and an orbiter. Unlike its ill-starred progenitor, however, Viking made no claim to be a precursor for a piloted Mars mission. In addition, Viking would be managed by NASA's Langley Research Center, not JPL, though the later would build the Viking orbiters. Many interpreted assignment of Viking management to Langley as a congressional rebuke to JPL for its independent mindset; efforts to preserve NASA centers as Apollo spending began to wind down probably also played a role.
Twin flyby Mariners 6 and 7 flew by Mars in 1969, and Mariner 9 orbited the planet in 1971-1972. After skipping the 1973 Mars launch opportunity, NASA launched Viking 1 on a Titan-IIIE rocket with a Centaur upper stage on 20 August 1975. Viking 1's Mariner-based, solar-powered orbiter and RTG-powered lander together weighed about 2.56 tons at launch. After deploying the lander in Mars orbit, the Viking 1 orbiter weighed about 898.1 kilograms.
The Viking 1 lander became the first spacecraft to land successfully on Mars on 20 July 1976, seven years to the day after Apollo 11 became the first manned lunar lander. The lander had a mass of about 598.7 kilograms after touchdown; of this, about 42.2 kilograms comprised scientific instrumentation. Viking 2 launched from Earth on 9 September 1975, and its lander touched down on 3 September 1976. At about three meters wide, the Viking landers were about half the size of the planned Voyager landers.
NASA and JPL recycled the Voyager name in 1977, applying it to twin Mariner-derived Jupiter-Saturn flyby spacecraft (the mission was originally called Mariner Jupiter-Saturn 77). Voyager 2 left Earth first, on 20 August 1977, atop a Titan III-E/Centaur. Voyager 1 launched 16 days later, on 5 September. Voyager 1 passed Voyager 2 on 19 December 1977, as the twin spacecraft traversed the Asteroid Belt between Mars and Jupiter.
![]() |
| Beyond Mars: artist concept of the flight path of a Mariner Jupiter-Saturn 77 spacecraft. Image credit: NASA. |
By that time, the decision had been made to add Uranus and Neptune to Voyager 2's list of targets. The intrepid spacecraft flew by the former at a distance of 81,500 kilometers on 24 January 1986, and passed the latter at a distance of just 4951 kilometers on 25 August 1989.
The Voyagers continue to transmit data on space conditions beyond the planets. At this writing, Voyager 1 is 144.7 Astronomical Units (AU) from the Sun (one AU is defined as the mean distance from Earth to the Sun, or about 149.6 million kilometers - for comparison, the most distant planet in the Solar System, Neptune, is on average 30.1 AU from the Sun). Radio signals traveling at the speed of light (299,792 kilometers per second) need more than 20 hours to reach it. Voyager 2, which dove below the plane of the Solar System after departing Neptune, is 119.8 AU from the Sun; radio signals need about 16 hours, 42 minutes to reach it.
Voyager 1 became the first spacecraft to pass beyond the heliosphere, the bubble of space where solar particles and fields are dominant, in August 2012. Voyager 2 joined it at the edge of interstellar space in November 2018.
Sources
Summary of the Voyager Program, NASA Office of Space Science and Applications, January 1967.
On Mars: Exploration of the Red Planet 1958-1978, NASA SP-4212, Edward Clinton Ezell and Linda Neumann Ezell, NASA, 1984, pp. 85-86, 101-103, 117-118.
Voyager: Mission Status (https://voyager.jpl.nasa.gov/mission/status/#where_are_they_now - accessed 4 February 2019).
Saturn IB/Centaur (http://heroicrelics.org/info/saturn-i-and-ib/saturn-ib-centaur.html - accessed 6 February 2019).
More Information
Centaurs, Soviets, and Seltzer Seas: Mariner 2's Venusian Adventure (1962)
Things To Do During a Venus/Mars/Venus Piloted Flyby Mission (1968)
Lunar Viking (1970)
The Challenge of the Planets, Part Three: Gravity
Purple Pigeon: Mars Multi-Rover Mission (1977)
![]() |
| Image credit: JPL/NASA. |
According to his 1989 memoir Journey into Space: The First Thirty Years of Space Exploration, Murray saw this as an opportunity. He quickly assembled a group of six engineers to propose planetary missions that he could pitch to the journalists and, through them, to U.S. taxpayers.
The missions, which Murray dubbed "Purple Pigeons," were intended to include both "high science content" and "excitement and drama [that would] garner public support." They were called Purple Pigeons to differentiate them from "Gray Mice," unexciting and timid missions which Murray felt would help to ensure that JPL had no future in the space exploration business. By August 1976, the Purple Pigeons flock included a solar sail mission to Halley's Comet, a Mars Surface Sample Return (MSSR), a Venus radar mapper, a Saturn/Titan orbiter/lander, a Ganymede lander, an asteroid tour, and an automated lunar base.
![]() |
| Bruce Murray, JPL director from April 1976 until June 1982. Image creditI JPL/Caltech. |
The image at the top of this post shows a somewhat different (probably later) multi-rover mission design. Its four six-wheel, multi-cab rovers (two of which are operating out of view over the horizon) rely on a single Viking orbiter-type spacecraft to relay radio signals to and from Earth. In principle, however, it is identical to the early multi-rover mission design described in this post.
Most MSSR plans of the 1970s assumed a "grab" sample; that is, that the stationary MSSR lander would return to Earth a sample of whatever rocks and soil happened to be within reach of its robotic sample scoop. The report suggested that the rovers of the multi-rover mission might enhance a follow-on MSSR mission by collecting and storing samples as they roved across the planet. After the MSSR lander arrived on Mars, the rovers would rendezvous with it and hand over their samples for return to Earth. The report contended that its multi-rover/MSSR strategy would be "an enormous advance over even multiple grab samples" collected by MSSR landers at widely scattered sites.
At the time the Purple Pigeons team proposed the multi-rover mission, NASA intended to launch all payloads, including interplanetary spacecraft, on board reusable Space Shuttles. The Shuttle orbiter would be able to climb no higher than about 500 kilometers, so launching payloads to higher Earth orbits or interplanetary destinations would demand an upper stage. The powerful liquid-propellant Centaur upper stage would not be ready in time for the opening of the Mars multi-rover launch window, which spanned from 11 December 1983 to 20 January 1984, so JPL tapped a three-stage solid-propellant Interim Upper Stage (IUS) to push its Purple Pigeon out of Earth orbit toward Mars.
After an Earth-Mars cruise lasting about nine months, the twin multi-rover spacecraft would arrive at Mars a week or two apart between 16 September and 27 October 1984. They would each fire their main engines to slow down so that Mars gravity could capture them into an elliptical orbit with a periapsis (low point) of 500 kilometers, a five-day period, and an inclination of 35° relative to the martian equator.
The multi-rover landers would then separate and each fire a solid-propellant de-orbit rocket at the apoapsis (high point) of its orbit to begin descent to the surface. Landing sites between 50° north latitude and the south pole would in theory be accessible, though the need for a direct Earth-to-rover radio link would in practice prevent landings below 55° south.
The landers would each be encased within an aeroshell with a heat shield for protection during the fiery descent through the martian atmosphere. The aeroshell would have the same 3.5-meter diameter as its Viking predecessor, though its afterbody would be modified to make room for the large cooling vanes of the twin rovers' electricity-producing Radioisotope Thermal Generators (RTGs).
![]() |
| JPL's dual rovers packed inside their modified Viking-type aeroshell. Image credit: JPL. |
The multi-rover lander, which would serve no purpose beyond rover delivery, would constitute a radical departure from the triangular Viking lander design, though it would use Viking technology where possible to save development costs. It would comprise a rectangular frame to which would be attached three uprated Viking-type terminal descent engines, two spherical propellant tanks, and three beefed-up Viking-type landing legs.
![]() |
| Multi-rover lander. Image credit: JPL. |
JPL envisioned that its four-wheeled rovers would each deploy a one-meter-tall boom holding a still-image camera, a floodlight, a strobe light, a weather station, and a pointable horn-shaped radio antenna. The camera/antenna boom, the tallest part of the rover, would stand about two meters above the surface. Controllers on Earth would then put the rovers through an initial checkout lasting at least two weeks. The checkout would culminate in slow "manual" (Earth-controlled) and faster semi-autonomous (Earth-directed but rover-controlled) traverses.
![]() |
| JPL's nuclear-powered rover viewed from above (top) and from the side. Image credit: JPL. |
The rover mobility system would include one electric drive motor per wheel, eight proximity sensors for obstacle detection, inclinometers to monitor rover tilt, motor temperature sensors to judge wheel traction, a gyrocompass/odometer, a laser rangefinder with a 30-meter range, and an "8-bit word, 16k active, 64k bulk, floating point arithmetic and 16-bit accuracy" computer. The JPL engineers judged that their rovers would be capable of moving at up to 50 meters per hour over terrain similar to that seen at the Viking 1 landing site.
![]() |
| Dusk at the Viking 1 landing site in Chryse Planitia. Image credit: NASA. |
In order to avoid "an overabundance of data from a single track," the rovers would travel slightly different routes and rendezvous at the end of each leg of their traverse. They would, however, travel close enough together that each could aid the other in the event of trouble. If one rover became stuck in loose dirt, for example, its companion could use its articulated arm to place rocks under its wheels to improve traction. If one rover of a pair failed, the report maintained, the other would continue to yield "good, solid science."
The rovers would be designed to operate for at least one martian year (about two Earth years) to help ensure that at least one of the four could successfully rendezvous with the follow-on MSSR mission, which would leave Earth in 1986. Estimates of rover traverse distances in 1970s and 1980s studies were typically highly optimistic, and the multi-rover mission was no exception: each of the mission's four rovers was expected to travel up to 1000 kilometers. The JPL engineers concluded their report by calling for new technology development to ensure that adequate power and mobility systems would become available by the time their Purple Pigeon was due to fly.
Sources
Journey into Space: The First Thirty Years of Space Exploration, Bruce Murray, W. W. Norton & Co., 1989.
Feasibility of a Mars Multi-Rover Mission, JPL 760-160, Jet Propulsion Laboratory, 28 February 1977.
More Information
Triple-Flyby: Venus-Mars-Venus Piloted Missions in the Late 1970s/Early 1980s (1967)
Prelude to Mars Sample Return: The Mars 1984 Mission (1977)
Making Propellants from Martian Air (1978)
Exploring Mars from Pole to Pole: MESUR Network (1991)
On 9 December 1978, the five parts of PV2 entered the thick, hot Venusian atmosphere. The drum-shaped probe carrier burned up as planned at an altitude of 110 kilometers. Sturdy conical heat shields protected the spherical instrumented probes from aerodynamic heating. As drag slowed it, the large probe deployed a parachute.
Two of the small probes, which did not include parachutes, exceeded all expectations by surviving landing and transmitting data from the hellish Venusian surface. One, the Day Probe, transmitted for 67.5 minutes before succumbing to heat, pressure, and battery failure, setting a new world record for spacecraft endurance on Venus.
PV2 was the last U.S. planetary mission launched until 1989. NASA Ames Research Center (ARC), located near San Francisco, California, managed PV2 and its sister spacecraft, PV1 (the Pioneer Venus Orbiter).
In July 1991, ARC proposed a multiprobe system outwardly not too different from PV2, but intended to create a long-lived network of low-cost science stations on Mars. According to ARC's report on the concept, its network would reflect a design philosophy with "unique characteristics . . . derived from the Pioneer Project corporate memory."
Mars networks were first proposed in the early 1970s. Scientific advisory groups endorsed the network concept repeatedly in the following two decades as the best way to obtain global-scale weather and seismic data. In the late 1980s, at the behest of the NASA Headquarters Solar System Exploration Division (SSED), the Jet Propulsion Laboratory (JPL) Precursor Task Team included a network in its program of precursor robotic missions for paving the way for astronauts on Mars. In common with previous Mars network plans, the 1989 plan invoked spear-shaped penetrators to hard-land stations at low cost.
NASA ARC's Mars Environment Survey (MESUR - pronounced "measure"), on the other hand, invoked cheap rough-landing landers, or "stations," that would deploy protective airbags seconds before landing. MESUR would build up a "pole-to-pole" network of 16 stations during the 1999, 2001, and 2003 minimum-energy Mars launch opportunities.
Each 158.5-kilogram MESUR lander would leave Earth attached toa Mars atmosphere entry deceleration system and a simple cruise stage. Upon arrival at Mars, each would cast off its cruise stage and enter the atmosphere directly from its Earth-Mars trajectory at up to seven kilometers per second. The ARC report compared this with the Viking landers, which entered from Mars orbit at only 4.4 kilometers per second. The lander's heat shield, a two-meter-diameter flattened cone, would be designed to withstand atmosphere entry during planet-wide dust storms, when suspended dust particles might exacerbate shield erosion.
![]() |
| Partial cutaway of a MESUR station on the surface of Mars. Image credit: NASA Ames Research Center. |
The report explained that solar cells were initially ARC's preferred MESUR power system, but analysis had shown that the number of cells that could be mounted on the lander's small surface would not generate enough electricity to drive its science instruments unless landings were limited to sites within 30° of the martian equator. This limitation was deemed unacceptable by the MESUR Science Definition Team, so engineers opted for a small (nine-kilogram) General Purpose Heat Source (GPHS) Radioisotope Thermal Generator (RTG) "brick" based on Ulysses solar polar orbiter/Galileo Jupiter orbiter RTG technology.
Sixteen MESUR landers would need 16 GPHS bricks over six years. The report noted that the entire MESUR Network would need less than half as much plutonium as the Cassini Saturn orbiter, which would carry two RTGs with 18 GPHS bricks each.
The landers would discard their cruise stages 125 kilometers above Mars. Ten kilometers above the planet, each would deploy a pilot parachute, then cast off its heat shield and open its single main parachute. The landers would image the surface and collect atmospheric structure data during the final eight kilometers of descent.
Just two meters above the landing site, each lander would release its main parachute and inflate its airbags. A small rocket on the parachute would ignite to prevent it from settling over the lander.
The MESUR lander design would permit landings at sites up to six kilometers above the base datum, the martian equivalent of Earth's sea level. The base datum, referenced to the minimum Mars atmospheric pressure required for liquid water to exist on the surface, was established after Mariner 9 mapped the planet from orbit in 1971-1972. (In 2001, a new system referenced to the mean radius of Mars as measured by Mars Global Surveyor's MOLA instrument replaced the base datum.)
Though all 16 MESUR landers would carry the same suite of instruments, their individual landing sites would be selected to cater to different science requirements. The report advised that weather stations should be spaced widely over the planet, while seismic stations should form closely spaced "triads." These conflicting requirements forced a "compromise network design."
MESUR Network Stations 1 and 2 would land near each other on the north rim of Valles Marineris to form a "seismic pair." Station 3, at the foot of Olympus Mons in Tharsis, would also emphasize seismic research. Station 4 would aim to extend the weather record for Chryse Planitia, where Viking 1 accumulated data from 1976 to 1983.
![]() |
| The Tharsis hemisphere of Mars showing proposed positions of MESUR stations. See text for explanation. Image credit: NASA. |
It would reach Mars in 10 months on a slow "Type II" trajectory to reduce the amount of propellant it would need to slow down so that the planet's gravity could capture it. Launch of the communications orbiter would be delayed until 2001 in order to spread its cost over a longer period.
With the successful arrival of the four 2001 stations, a "minimal network" would be in place on Mars. Station 5, on the Marineris north rim, would create a "seismic triad" with Stations 1 and 2, while Station 6, northwest of Olympus Mons, would create a seismic pair with Station 3. Station 7, east of Solis Planum ("a region of known dust storm activity"), and Station 8, in western Acidalia Planum, would expand martian meteorological coverage.
The final two MESUR Delta II 7925 launches in 2003 would boost four landers each on course for Mars. Stations 9 and 10 would be located near the north and south poles, respectively, while Station 11 would report weather conditions in Aonia Terra, southwest of the great Argyre basin. Stations 12 (northwest Hellas), 13 (Elysium Planitia), and 14 (Deuteronilus Mensae) would further extend martian meteorological coverage.
Station 15 (Sirenum Terra) would form a Tharsis seismic triad with Stations 3 and 6. Station 16, in Syrtis Major on the side of Mars opposite Olympus Mons, would create a seismic pair with Station 13 and, with the Tharsis triad, enable the size of Mars's core to be determined.
![]() |
| The Syrtis Major hemisphere of Mars showing proposed positions of MESUR stations. See text for explanation. Image credit: NASA. |
In its 1991 strategic plan, published the same month as ARC's MESUR report, the SSED dubbed MESUR its "baseline plan" for a Mars network mission. In November 1991, NASA elected to move MESUR Phase A development to JPL, where the project was split into two parts.
MESUR Network would be preceded by MESUR Pathfinder, a single-spacecraft mission for technology testing. Pathfinder was built larger than the the planned MESUR landers so that it could deliver to Mars a six-wheeled "microrover." JPL also opted for solar power in place of NASA ARC's RTG bricks and a petal system to permit it to flip itself upright and release the rover instead of small instrument deployment ports.
In 1994, in the wake of the Mars Observer failure, NASA funded the Mars Surveyor Program in place of MESUR Network. Work continued on Pathfinder under the auspices of NASA's low-cost Discovery Program, however, and it landed successfully on Mars on 4 July 1997.
![]() |
| Mars Pathfinder Lander (background) and Sojourner rover. Image credit: NASA. |
Mars Environmental Survey (MESUR) Science Objectives and Mission Description, NASA Ames Research Center, 19 July 1991.
Solar System Exploration Division Strategic Plan: Preparing the Way to the New Frontier of the 21st Century, Special Studies Office, Space Telescope Science Institute, July 1991.